PG&E Gas Leak Repair on Monday, April 6

The following was received from the S.R. Public Works Department today:

PG&E just notified us that they will be repairing a gas leak on the east bound lane of Point San Pedro Road in front of the High School next Monday (April 6, 2015).

Yup, this is a brand new road. We are requiring them to grind and resurface both lanes for a 20’ reach.

Unfortunately, they believe this to be an emergency such that the work cannot be postponed.

Kevin McGowan
Assistant Public Works Director/City Engineer

Scroll to Top