Delay on Pt. San Pedro Road Repaving Project

All concrete work is complete. However, due to unfavorable weather conditions (cold temperatures and rain), the City has decided to postpone Point San Pedro Road resurfacing (from the Dutra Quarry entrance to Biscayne Drive) until early spring 2016. Check http://www.cityofsanrafael.org/pubworks-proj-dppspres for updates.

See a previous post (Posted 11/19/15) for more details on this project.

Scroll to Top