Loch Lomond Marina: Library/Archive

LIBRARY ITEMDESCRIPTION
Committee Operating Guidelines and ProceduresGoverning document for the Loch Lomond Marina Committee
GP2020
Link to the City of San Rafael website documenting General Plan 2020 (GP2020) which governs development within the City limits, including the Loch Lomond Marina site.Currently, this plan is being updated for the succeeding 20 years and being called General Plan 2040 (GP2040). You can follow this activity on this website’s GP2040 pages.
GP2020, Section NH-118GP2020, Section NH-118, deals with the Loch Lomond Marina. Go to this linked page and scroll down to page 109 to see this element of the full document.
San Rafael Development Department
This page on the San Rafael website is specifically devoted to the Loch Lomond Marina development
The Strand at Loch Lomond Marina
This is the link to the sales page for the Loch Lomond Marina project residences.
BCDC Cease & Desist and Civil Penalty Order CCD 2016.04BCDC Stipulated Cease and Desist and Civil Penalty Order CCD 2016.04 reviewed by BCDC Enforcement Committee on October 20, 2016 in advance of approval by the full Commission on November 3, 2016
Year 1 Wetlands Report
Year 1 Annual Loch Lomond Marina Wetlands Monitoring Report – December 2016
Year 2 Wetlands ReportYear 2 Annual Loch Lomond Marina Wetlands Monitoring Report – December 2017
Full BCDC Permit, including all amendments thru #11This is the full BCDC Permit that encompasses the Loch Lomond Marina project (Village at Loch Lomond Marina), including the residential portion known as The Strand. This document was re-issued July 30, 2021, to include Permit Amendments #7, #9 and #11.
Noble Consultants Project DrawingsThese are the latest project drawings for the work to be done related to BCDC Permit Amendment #5 dealing with the resolution of the flooding in the East Spit (playground) and connector to the breakwater. It is referenced in the BCDC Permit #5 as “Project Drawings for Loch Lomond Marina Site Improvements prepared by Noble Consultants and GEC and dated August 2, 2019”.
Scroll to Top